Presentation SafetyPlast - Naples - 11.07.08
Work: Doors of the Park - Yard: Bagnoli Futura
Work: Doors of the Park - Yard: Bagnoli Futura
Disassembling of the existing guardrail in place - Time for 30 metres: about 2 hours of 2 men | |||
![]() |
![]() |
![]() |
![]() |
Handling of a packing that consists of 80 linear metres of railing, by crane | ||||
![]() |
![]() |
![]() |
![]() |
![]() |
Assembling by riveting gun, of the anchor clamps for level floor | |||
![]() |
![]() |
![]() |
![]() |
Assembling of the railing | ||||
![]() |
![]() |
![]() |
![]() |
![]() |
The whole system assembled: time 30 metres in 17 minutes | |||||||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||
![]() |
![]() |
![]() |
![]() |
![]() |